| Some of the shelves |
Thursday, August 12, 2010
The stain goes on
It has taken two days and three person days to put stain on all of the woodwork. Below is a sample. The varnish goes on tomorrow
Tuesday, August 10, 2010
The trim is done
Tuesday, August 3, 2010
Trim and gutters
Yesterday, the trim carpenter and his son started work. Here is their day's work
| Electronics Storage (TV to right) |
| Bookcase in Study |
| Storage Cabinet in Study |
| Pile of Wood left over from first day |
| All of the windows are finished. The Rosettes should be here next week |
| The electronics cabinet (door next week) |
| Storage Cabinet with shelves - doors and drawers next week |
| Bookshelves with a view of the mantle in the living room |
| Full view of mantle. Inside the mantel and hearth will be granite |
| Gutters |
| New Kitchen Window |
Wednesday, July 28, 2010
Wallboard finished and Painting started
As the title states, the wallboard is all up and the outside is painted. Some amount of priming has been done on the inside
And now for the outside paint
There is still plastic over the windows so that they can give the building a second coat of paint
And now for the outside paint
There is still plastic over the windows so that they can give the building a second coat of paint
Sunday, July 18, 2010
Arches and other pictures
The arches are really visible now that the dry wall is going up.
Mike is the guy putting up the drywall
Mike is the guy putting up the drywall
Sunday, July 11, 2010
The drywall is going on
We took some time to go visit my family over July 4th - what a great looking crew
To keep you all up to date, the arches between the dining room and living room / kitchen have been modified.
Then the drywall is starting to be installed - this is the living room looking at the fire place - then the ceiling
Now for the study - the door into the living room, the fire place and looking west
To keep you all up to date, the arches between the dining room and living room / kitchen have been modified.
Then the drywall is starting to be installed - this is the living room looking at the fire place - then the ceiling
Now for the study - the door into the living room, the fire place and looking west
Wednesday, June 30, 2010
End of June = just prior to wall board and insulation
It has been a while, so I thought that I would add more pictures. A lot of detail work has been completed.
Fireplace, TV, TV build in area, trim, etc.
Fireplace, TV, TV build in area, trim, etc.
Subscribe to:
Posts (Atom)